Electricity Connection Price
A new electricity connection is charged at a price that depends on the main fuse size and the location of the property. Below you can see how these factors affect the pricing.

Electricity connections
-
Low voltage connections VAT 25,5 % Zone 1: The connection is located in a town plan area or the distance to the existing substation is a maximum of 200 m
Main fuse 3 x 25 A 2,441,00 € 3 x 35 A 2,986,00 € 3 x 50 A 4,200,00 € 3 x 63 A 4,665,00 € 3 x 80 A 5,688,00 € 3 x 100 A 7,167,00 € Larger fuse sizes are priced on a case-by-case basis
Zone 2: The distance from the connection to the existing substation is 200–400 m
Main fuse 3 x 25 A 3,426,00 € 3 x 35 A 4,559,00 € 3 x 50 A 5,870,00 € 3 x 63 A 7,643,00 € Larger fuse sizes are priced on a case-by-case basis
Zone 3: The distance from the connection to the existing substation is 400–600 m
Main fuse 3 x 25 A 4,728,00 € 3 x 35 A 6,149,00 € 3 x 50 A 7,923,00 € 3 x 63 A 9,998,00 € Changing a single-phase connection to a three-phase connection 1,155,00 € Larger fuse sizes are priced on a case-by-case basis
If the customer increases the size of the main fuses within the zone pricing area, the connection fee will be the difference between the connection fees for the old and new fuse sizes according to the current price list.
Medium voltage connections The price of a medium voltage connection consists of a capacity reservation fee and the direct construction costs.
Capacity reservation fee €35.4/kVA + VAT 25.5%
Capacity reservation fee for substation connection €10.60/kVA + VAT 25.5%* The largest low voltage connection has a size of 1,250 A. If the connection line is changed from an overhead line to an underground cable at the request of the customer and/or the connection point is moved without changing the main fuse size, a minimum fee of €200 (VAT 25.5%) will be charged.
Recommended cross-sectional areas for connection cables by fuse size
| Main fuse | Connection cable |
|---|---|
| 25 – 50 A | AXMK 4×25 |
| 63 – 80 A | AXMK 4×50 |
| 100 – 125 A | AXMK 4×95 |
| 160 – 250 A | AXMK 4×185 |
| 315 – 500 A | 2(AXMK 4×185) |
| 630 A | 2(AXMK 4×300) |
| 750 A | 3(AXMK 4×300) |
| 800 A | 4(AXMK 4×300) |
| 1000 A | 4(AXMK 4×300) |
| 1250 A | 5(AXMK 4×300) |
Processing time for electricity connection requests
| Connection | Processing time |
|---|---|
| 3 X 25 A–3 X 50 A | 2 weeks |
| 3 X 63 A–3 X 1250 A | 4 weeks |
| 20 kV | 4 weeks |
| Area priced (secondary residence) | 4 weeks |
* The processing time may be considerably shorter than stated. The schedule applies to connections located outside the designated zones and to larger connections not covered by the price list above.