Electricity connections

  • Low voltage connections VAT 25,5 %

    Zone 1: The connection is located in a town plan area or the distance to the existing substation is a maximum of 200 m

    Main fuse
    3 x 25 A 2,441,00 €
    3 x 35 A 2,986,00 €
    3 x 50 A 4,200,00 €
    3 x 63 A 4,665,00 €
    3 x 80 A 5,688,00 €
    3 x 100 A 7,167,00 €

    Larger fuse sizes are priced on a case-by-case basis

    Zone 2: The distance from the connection to the existing substation is 200–400 m

    Main fuse
    3 x 25 A 3,426,00 €
    3 x 35 A 4,559,00 €
    3 x 50 A 5,870,00 €
    3 x 63 A 7,643,00 €

    Larger fuse sizes are priced on a case-by-case basis

    Zone 3: The distance from the connection to the existing substation is 400–600 m

    Main fuse
    3 x 25 A 4,728,00 €
    3 x 35 A 6,149,00 €
    3 x 50 A 7,923,00 €
    3 x 63 A 9,998,00 €
    Changing a single-phase connection to a three-phase connection 1,155,00 €

    Larger fuse sizes are priced on a case-by-case basis

    If the customer increases the size of the main fuses within the zone pricing area, the connection fee will be the difference between the connection fees for the old and new fuse sizes according to the current price list.

    Medium voltage connections

    The price of a medium voltage connection consists of a capacity reservation fee and the direct construction costs.

    Capacity reservation fee €35.4/kVA + VAT 25.5%
    Capacity reservation fee for substation connection €10.60/kVA + VAT 25.5%

    * The largest low voltage connection has a size of 1,250 A. If the connection line is changed from an overhead line to an underground cable at the request of the customer and/or the connection point is moved without changing the main fuse size, a minimum fee of €200 (VAT 25.5%) will be charged.

Recommended cross-sectional areas for connection cables by fuse size

Main fuseConnection cable
25 – 50 AAXMK 4×25
63 – 80 AAXMK 4×50
100 – 125 AAXMK 4×95
160 – 250 AAXMK 4×185
315 – 500 A2(AXMK 4×185)
630 A2(AXMK 4×300)
750 A3(AXMK 4×300)
800 A4(AXMK 4×300)
1000 A4(AXMK 4×300)
1250 A5(AXMK 4×300)

Processing time for electricity connection requests

ConnectionProcessing time
3 X 25 A–3 X 50 A2 weeks
3 X 63 A–3 X 1250 A4 weeks
20 kV4 weeks
Area priced (secondary residence)4 weeks

* The processing time may be considerably shorter than stated. The schedule applies to connections located outside the designated zones and to larger connections not covered by the price list above.